Ava bridge & lift system
Info pack
AVA is ready for launch with viewings available from mid-2024 onwards.
Get in touch to book your viewing, or download the info packs below.

Download
5.9MB
AVA
Adaptable Bridge
& Lift System
Info Pack
"A fully modular construction that is simpler, better & greener."
Overview
Key facts and features of AVA outlined:
- Performance overview
- Fully modular construction
- Adaptable to local requirements
- Faster delivery, simpler installation
- Longer lasting with minimal maintenance
- AVA Modular Lift - A turnkey solution
- Future AVA

Download
16.4MB
National Rail
Footbridges
& Subways
Design Manual
NR/GN/CIV/200/07
"A clear visual identity with easy on-site construction."
Overview
We are proud to feature in the Network Rail Footbridges & Design manual.
The AVA Bridge and Lift System scores the maximum points in every category in an independent assessment of Network Rail approved footbridges.